Kirkuk-Ceyhan Pipeline: 970km Flow at 80 Bar
botasThe Kirkuk-Ceyhan pipeline, spanning 970 km, resumes operations at 80 bar pressure. This critical infrastructure enables 1.2 million bpd flow and restarts 14 Iraqi wells.
Read Report →