Lobito Corridor: Draft Constraints & 2.2 Mt Forecast to 2026
port-infrastructureLobito Corridor’s draft limits, with a draft range of 9.4-10m, impact larger vessels. This necessitates transshipment, increasing operational costs & posing logistical challenges.
Read Report →